End Time (Consultant Episode)

Change History

 

DSCN 2019 / 03

APC data set – Time Fields

 

This data item is / was included in the following data sets / collections between the dates shown:

 

Data Set / Collection

Valid From

Valid To

APC ds

1st February 2019

 

 

This is the end time of a stay, an episode, period covered by a plan, or other period of time. 

 

Format: hh:mm:ss