Date of SCP Clock Stop

Change History

 

DSCN 2020 / 28

Suspected Cancer Pathway – Core (AMD)

DSCN 2020 / 21

Single Cancer Pathway - Core

 

This data item is / was included in the following data sets / collections between the dates shown:

 

Data Set / Collection

Valid From

Valid To

SCPC ds

1st January 2021

 

 

Date at which one of the following conditions applied:

     Date of Downgrade

     Start of Definitive Treatment

     Date of Death

 

As any of these conditions stop the clock for Single Cancer Pathway (SCP), only one date should be recorded.

 

Format: 8 digit numeric, CCYYMMDD